Saltwater Repair, Puget Sound Naval Ship Yard
Description:
Design and construction, to replace the pump house and controls for a salt water pump supporting a PSNS drydock. The project also included a permanent Emergency Diesel Generator with an Automatic Bus Transfer switch to supply power to the salt water pump.
Key Components:
-
Design-build
- Fiber optic cabling
- Switchgear installation
- 5kV substation bus connection
- 1000kW Generator & automatic bus transfer switch