Image

Saltwater Repair, Puget Sound Naval Ship Yard

 

Description:

Design and construction, to replace the pump house and controls for a salt water pump supporting a PSNS drydock. The project also included a permanent Emergency Diesel Generator with an Automatic Bus Transfer switch to supply power to the salt water pump.

Key Components:

  • Design-build

  • Fiber optic cabling
  • Switchgear installation
  • 5kV substation bus connection
  • 1000kW Generator & automatic bus transfer switch